GALLERY

We are proud of the work we do, why not take a look for yourself what our customers say!
Follow us on Facebook, we like to share our achievements there too!

Bathroom Re-tiling  

Removal of existing tiles and re-tiled and decorated to a high finish as per customer specification.


New Bathroom Installation on 3rd Floor          

This job required the existing stud walls to be knocked down, new stud walls put up, plastered and tiled.
Electrics rewired/installed, Plumbing for two toilets and one shower installed.
Bathrooms were both stylishly tiled.


Kitchen Re-fit and refurbish of office kitchen        

This job required the boxing in and plastering of the existing boiler unit.
Room re-decorated, painted and down lighting installed.
Old kitchen units removed and new kitchen units and wooden work surface installed.
New floor covering laid.


Electrical Re-Wiring of property  

Old electrical cables and fittings removed, new cables installed with white fittings.
New metal consumer unit conforming to BS7671 amendment 3 with NICEIC Certificate issued.
Heat alarm and smoke alarm on landing connected together.
LED downlights fitted in the lounge, kitchen and bathroom.

Really good company – had the pleasure of re-wiring our 3 bed house in record time and Chris Samaras went far and above of what was required. He was very accommodating and we cannot imagine having it all done without him. As first time homeowners we were very reassured and Chris helped us with more than just the rewire. Very professional efficient and most of all a nice trustworthy person. Would definitely recommend and will use in the future. Again a massive thank you!

Mr E. Gregory


Courtyard re-bricked and wall built     

The area required the existing bricks to be taken up and the courtyard to be re-designed and new brickwork to be laid to keep in style with the Victorian Building.


Downlighting Installed in an office  

Old ceiling lighting removed and spot lights installed to create a well lit working environment.


House re-decoration/re-touching     

Staining and varnishing the wooden stair case, skirting board and doors. All the walls and window sills were repainted leaving the home feeling fresh and rejuvenated.


Plastering   

This job required the chimney to be re-beaded and replastering to provide a smooth finish ready for painting.


© 2016 Property Care Specialists. All rights reserved.